男女嘿咻吃奶头视频免费在线观看一区,a4yy午夜,黄色av色欲网址,日韩欧美人成在线观看,成人AV电影在线播放,欧美日本视频一区

中文版     ENGLISH 
News
Contact UsMore>>
Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
Tel:86-0755-26788241
Fax:86-0755-26788245
Industry NewsNews > Industry News > Typical Three-Level Architecture of BMS in Energy Storage Power Stations    

Typical Three-Level Architecture of BMS in Energy Storage Power Stations

Hits:1  Add Date:2024/5/17
Battery Management Systems (BMS) typically employ a three-level architecture (subordinate control, main control, and master control) to manage and control battery modules, clusters, and stacks. Below is a brief introduction to the three-level architecture of a BMS system.


First Level: Battery Management Unit (Subordinate Control)
The first level is the Battery Management Unit (BMU), also known as the Energy Storage Battery Management Module (ESBMM) or Cell Supervision Unit (CSU), depending on the manufacturer. This level primarily focuses on the collection of individual cell voltages and temperatures and executing battery balancing strategies. Data collected by the BMU is communicated to the second level via communication links, typically using CAN or daisy chain communication methods.


Second Level: Battery Cluster Management Unit (Main Control)
The second level is the Battery Cluster Management Unit (BCU) or Energy Storage Battery Cluster Module (ESBCM). This unit is responsible for collecting voltage, current, and insulation information of the battery cluster, controlling the contactors for battery protection, gathering information from the first-level BMU, and estimating battery state (SoX). The data collected by the BCU is communicated to the third level via communication links, usually employing CAN or Ethernet.


Third Level: BMS System Management Host or Stack-Level Management Unit (Master Control)
The third level is the BMS System Management Host or Stack-Level Management Unit, also referred to as Battery Stack Management Unit (BSU), Energy System Management Unit (ESMU), Battery Array Management System (BAMS), or Battery Array Unit (BAU). This level's primary functions include collecting information transmitted from the second-level BCU, storing and displaying data, providing real-time alarms, controlling the main circuit breaker, and offering contact feedback. It also ensures real-time communication with the Power Conversion System (PCS), Energy Management System (EMS), and local monitoring systems.
PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
攀枝花市| 成武县| 石屏县| 鞍山市| 荔波县| 乌兰察布市| 台东市| 南郑县| 布拖县| 横峰县| 泗水县| 深水埗区| 景德镇市| 深水埗区| 巴林右旗| 威远县| 昆明市| 黄骅市|